Penrose Dock
Steel Fabrication included Precambered steel, 120 Minute Fire Protection over 1000 No Service Opes in the webs of steel to allow M&E to run through. Over 600 Techrete Brackets welded to the edge beams to support the Architectural precast.
No items found.
Previous project
No previous project
Back To ProjectsNext project
No next project
Back To Projects