Horgan’s Quay

Steel Fabrication included Pre-cambered steel, 120 Minute Fire Protection over 1500 No Service Opes in the webs of steel to allow M&E to run through. Over 400 Techrete Brackets welded to the edge beams to support the Architectural precast.

Project:
Horgan’s Quay, Cork
Client:
BAM Property / Clarendon
Size:
1000Tn
Scope:
Structural Steel, Intumescent, Metal Deck
Architect:
O’Mahony Pike
Engineer:
Murphy Matson O’Sullivan
Main Contractor:
BAM