Horgan’s Quay
Steel Fabrication included Pre-cambered steel, 120 Minute Fire Protection over 1500 No Service Opes in the webs of steel to allow M&E to run through. Over 400 Techrete Brackets welded to the edge beams to support the Architectural precast.