Ei Electronics

Steel Fabrication included Cell Beams, and 64 No Steel Trusses along with Fire Rating of the trusses in our Workshop. We also fabricated a full welded 10 Tn Lift Frame, which is the Centre piece of the Main Entrance Lobby.

Project:
Ei Electronics - Shannon
Client:
Ei Electronics
Size:
650 Tn
Scope:
Structural Steel including 64 No Trusses
Architect:
O’Neill-O’Malley
Engineer:
CSC Engineers
Main Contractor:
Monami Construction Ltd